RICS Knowledge Services Catalogue
  • Lists
    Public lists Landlord & Tenant - Residential UK Building Control Reducing environmental impact of the Built Environment Residential Property RICS Practice Alerts Cladding RICS Consumer Guides Practice Alerts and Updates - Building Surveying APC Spray Foam View all
RICS logo
  • Advanced search
  • Libraries
  1. Home
  2. Details for: Integration of time and cost control.
Image from Google Jackets
Normal view MARC view ISBD view

Integration of time and cost control.

By:
  • Baxendale, A.T
Contributor(s):
  • Chartered Institute of Building
Language: English Series: Construction Papers ; 7Publication details: Ascot, Berks. Chartered Institute of Building 1992Description: (12)p. ; 30cmSubject(s):
  • COST CONTROL
  • TIME CONTROL
  • BUILT ENVIRONMENT
LOC classification:
  • 658.1552
  • Holdings ( 1 )
Holdings
Item type Current library Call number Copy number Status Barcode
Book London Enquiry desk BOXED SET (Browse shelf(Opens below)) 1 Available 30033687
Browsing London shelves, Shelving location: Enquiry desk Close shelf browser (Hides shelf browser)
Previous
No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available
Next
BOXED SET Liquidated and ascertained damages. BOXED SET Schools` design and maintenance in England and Wales. BOXED SET An analysis of the JCT design & build contract. BOXED SET Integration of time and cost control. BOXED SET The just-in-time concept to improving manufacturing productivity: is it applicable to the construction industry? BOXED SET Total quality management in construction. BOXED SET Building the image - a study of the performance factor.
Browse results Close
Previous
Back to results
Next
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 161 Greater flexibility in planning guidance
  • 162 'Bungling could mean two year halt to meat exports'
  • 163 Blair tackles ministry amid rising tension
  • 164 NBA calls for export ban
  • 165 Farms inquiry confusion
  • 166 Farmers should go to market
  • 167 FMD: guidance for growers of crops and grass
  • 168 Proposed GM maize trial sites
  • 169 Extensification payment scheme 2001
  • 170 Epidemic may have peaked
  • 171 Agricultural charges and foot-and-mouth compensation
    by Hill, G.
  • 172 Foot and mouth crisis
  • 173 Reform of Common Agricultural Policy
  • 174 The Uncertain Growth of Part-Time Farming and Diversification
    by Hodge, I.
  • 175 Too many want to go
  • 176 Does MAFF need to be farmed out?
    by Tew, W.
  • 177 Hills Task Force reports
  • 178 Scoring an own goal
    by Ogg, D
  • 179 Scoring for success in England
  • 180 Restocking resolutions - Aberfoyle shows the way
    by Kennedy, D.
Close

Integration of time and cost control.

APA

Baxendale A., Chartered Institute of Building, . (1992). Integration of time and cost control. Ascot, Berks: Chartered Institute of Building.

Chicago

Baxendale A.T, Chartered Institute of Building, . 1992. Integration of time and cost control. Ascot, Berks: Chartered Institute of Building.

Harvard

Baxendale A., Chartered Institute of Building, . (1992). Integration of time and cost control. Ascot, Berks: Chartered Institute of Building.

MLA

Baxendale A.T, Chartered Institute of Building, . Integration of time and cost control. Ascot, Berks: Chartered Institute of Building. 1992.

  • Print
  • Cite
  • Send to device
  • Save record
    BIBTEX Dublin Core MARCXML MARC (non-Unicode/MARC-8) MARC (Unicode/UTF-8) MARC (Unicode/UTF-8, Standard) MODS (XML) RIS ISBD
  • More searches
    Search for this title in:
    Other Libraries (WorldCat) Other Databases (Google Scholar) Open Library (openlibrary.org)

Exporting to Dublin Core...

Visit web site

Email RICS KIS

Powered by Koha