Your search returned 4 results.

Sort
Results
1.
Image from Google Jackets
Risk management in project organisations by Language: eng.
Publication details: Oxford Butterworth-Heinemann 2005
Availability: Items available for loan: London (1)Collection, call number: 658.404 EDW.
2.
Image from Google Jackets
Construction time prediction: the forgotten service by Series: Cost Engineer ; 40(4) September 2002, 7-11(5)
Publication details: 2002
Availability: Items available for loan: London (1)Collection, call number: ABS66018.
3.
Image from Google Jackets
A communication-based analysis of the theory of price planning and price control by Series: RICS Foundation Research Papers ; 1(2)Language: English
Publication details: London RICS 1995
Availability: Items available for loan: London (3)Collection, call number: RICS 1995/32, ...
4.
Image from Google Jackets
The synthesis of network models and expert systems by Series: Cost Engineering ; 31(11) November 1989, 13-19(7)Language: English
Publication details: 1989
Availability: Items available for loan: London (1)Collection, call number: ABS41939.