Cost study
Language: English Series: Building ; 262(8008) 26 September 1997, 60-65(6)Publication details: 1997Subject(s): Summary: A new monthly series giving detailed cost commentaries of recent projects. This issue looks at the refurbishment/redevelopment of a grade-I listed bank and an adjacent 1960s tower block in Manchester. Includes an elemental cost analysis.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS57701 (Browse shelf(Opens below)) | 1 | Available | 81290-1001 |
A new monthly series giving detailed cost commentaries of recent projects. This issue looks at the refurbishment/redevelopment of a grade-I listed bank and an adjacent 1960s tower block in Manchester. Includes an elemental cost analysis.