Image from Google Jackets

Building study they have been brave in making the building address the street rather than hide behind a fence

By: Language: English Series: Architects' Journal ; 224(16) 2 November 2006, 24-35(9)Publication details: 2006Subject(s): Summary: Reports on the design, architecture and costing of the Tolladine Sure Start and Community Centre, Worcester. Contains building costs (gross external floor area), architects' drawings, layout plans and project credits. The total cost was £535 277.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L135555 (Browse shelf(Opens below)) 1 Available 135555-1001

Reports on the design, architecture and costing of the Tolladine Sure Start and Community Centre, Worcester. Contains building costs (gross external floor area), architects' drawings, layout plans and project credits. The total cost was £535 277.