Image from Google Jackets

Cost control in the Chinese construction sector

By: Language: English Series: Project Control Professional ; 48(5) September 2010, 16-22(7)Publication details: 2010Subject(s): Summary: History of cost control and cost engineering in China; the cost control process normally involves 5 key stages, feasibility stage, preliminary design stage, detailed design stage, construction stage, and post-completion stage; the tendering and bidding system; bills of quantities and all-in rates; contract forms; qualification control.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L151015 (Browse shelf(Opens below)) 1 Available 151015-1001

History of cost control and cost engineering in China; the cost control process normally involves 5 key stages, feasibility stage, preliminary design stage, detailed design stage, construction stage, and post-completion stage; the tendering and bidding system; bills of quantities and all-in rates; contract forms; qualification control.