Image from Google Jackets

A critical examination of the designer`s role under the ICE Design and Construct Conditions of Contract and the Highways Agencies Design and Build Conditions of Contract

By: Contributor(s): Language: English Series: RICS Foundation Research Papers ; 3(2)Publication details: London RICS 1999Description: ii, 24p. 30cmISBN:
  • 0854069380
ISSN:
  • 1354-506X
Subject(s): LOC classification:
  • 624.08
Summary: Research indicating that Highways Agency designers have far more responsibility than their ICE counterparts because of the supervisory and certifying role that is demanded by the Agency, whereas the ICE designers need not be site based at all.
Holdings
Item type Current library Call number Copy number Status Barcode
Archive London RICS Boxes RICS 1999/22 (Browse shelf(Opens below)) 1 Available 30058160
Reference material London RICS Boxes RICS 1999/22 (Browse shelf(Opens below)) 2 Available 30058161
Book London RICS Boxes RICS 1999/22 (Browse shelf(Opens below)) 3 Available 30058162

Research indicating that Highways Agency designers have far more responsibility than their ICE counterparts because of the supervisory and certifying role that is demanded by the Agency, whereas the ICE designers need not be site based at all.