A critical examination of the designer`s role under the ICE Design and Construct Conditions of Contract and the Highways Agencies Design and Build Conditions of Contract
Language: English Series: RICS Foundation Research Papers ; 3(2)Publication details: London RICS 1999Description: ii, 24p. 30cmISBN:- 0854069380
- 1354-506X
- 624.08
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Archive | London RICS Boxes | RICS 1999/22 (Browse shelf(Opens below)) | 1 | Available | 30058160 | |
| Reference material | London RICS Boxes | RICS 1999/22 (Browse shelf(Opens below)) | 2 | Available | 30058161 | |
| Book | London RICS Boxes | RICS 1999/22 (Browse shelf(Opens below)) | 3 | Available | 30058162 |
Research indicating that Highways Agency designers have far more responsibility than their ICE counterparts because of the supervisory and certifying role that is demanded by the Agency, whereas the ICE designers need not be site based at all.