Your search returned 6 results.

Sort
Results
1.
Image from Google Jackets
Partnerships stil a dirty word? by Series: House Builder ; 57(4) May 1998, 30-31(2)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS58720.
2.
Image from Google Jackets
Float principle by Series: House Builder ; December 1998, 21(1)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS59758.
3.
Image from Google Jackets
The assessment of damages for delay in construction contracts : liqudated and unliquidated damages by Series: Construction Law Journal ; 10(3) 1994, 214-224(11)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS51202.
4.
Image from Google Jackets
Effect of variation instructions issued after the contractual completion date by Series: Civil Engineering Surveyor ; 18(5) June 1993, 13-14(2)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: ABS48761.
5.
Image from Google Jackets
Liquidated damages by Series: Civil Engineering Surveyor ; 17(1) February 1992, 17-18(2)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: ABS45810.
6.
Image from Google Jackets
Global claims by Series: Civil Engineering Surveyor ; 17(2) March 1992, 17-18(2)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: ABS46027.