Your search returned 2 results.

Sort
Results
1.
Image from Google Jackets
Construction productivity: a survey of industry practices by Series: Cost Engineer ; 38(6) November 2000, 20-23(4)
Publication details: 2000
Availability: Items available for loan: London (1)Collection, call number: ABS63116.
2.
Image from Google Jackets
Quantifying construction claims using the differential cost method by Series: Construction Management & Economics ; 11(2) March 1993, 163-166(4)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: X753.