Scheduling techniques for different project classifications
Language: English Series: Project Control Professional ; 54(2) March 2016, 17-23(7)Publication details: 2016Subject(s): LOC classification:- 690.0685
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L159227 (Browse shelf(Opens below)) | 1 | Available | 159227-1001 |
Outlines different scheduling methods from the construction industry, and through research and an industry survey, the most appropriate scheduling technique is aligned in a matrix to each differing life-cycle stage and project classification.