Image from Google Jackets

Cost study

By: Contributor(s): Language: English Series: Building ; 262(8008) 26 September 1997, 60-65(6)Publication details: 1997Subject(s): Summary: A new monthly series giving detailed cost commentaries of recent projects. This issue looks at the refurbishment/redevelopment of a grade-I listed bank and an adjacent 1960s tower block in Manchester. Includes an elemental cost analysis.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS57701 (Browse shelf(Opens below)) 1 Available 81290-1001

A new monthly series giving detailed cost commentaries of recent projects. This issue looks at the refurbishment/redevelopment of a grade-I listed bank and an adjacent 1960s tower block in Manchester. Includes an elemental cost analysis.