Your search returned 3 results.

Sort
Results
1.
Image from Google Jackets
Data modelling and the application of a neural network approach to the prediction of total construction costs by Series: Construction Management and Economics ; 20(6) 2002, 465-472 (8)
Publication details: 2002
Availability: Items available for loan: London (1)Collection, call number: ABS65903.
2.
Image from Google Jackets
Methods and rates for precast concrete erection. by Series: Construction Papers ; 23Language: English
Publication details: Ascot, Berks. Chartered Institute of Building 1993
Availability: Items available for loan: London (1)Collection, call number: BOXED SET.
3.
Image from Google Jackets
Methods and rates for structural steelwork erection by Series: Technical Information Service ; 114Language: English
Publication details: Ascot,Berks Chartered Institute of Building 1990
Availability: Items available for loan: London (1)Collection, call number: BOXED SET.