Your search returned 4 results.

Sort
Results
1.
Image from Google Jackets
A study on the composition of construction logistics costs [electronic resource] by Language: English
Publication details: London RICS 2010
Online resources:
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
2.
Image from Google Jackets
3.
Image from Google Jackets
An integrated regression analysis and time series model for construction tender price index forecasting by Series: Construction Management and Economics ; (22) June 2004, 483-493(11)
Publication details: 2004
Availability: Items available for loan: London (1)Collection, call number: ABS67995.
4.
Image from Google Jackets
Contractor selection for small buildings works in Hong Kong by Series: Structural Survey ; 20(4) 2002, 129-135 (6)
Publication details: 2002
Availability: Items available for loan: London (1)Collection, call number: ABS65954.