Your search returned 6 results.

Sort
Results
1.
Image from Google Jackets
Construction resource/method factors influencing productivity for high rise concrete construction by Series: Construction Management and Economics ; 17(5) September 1999, 577-587(11)
Publication details: 1999
Availability: Items available for loan: London (1)Collection, call number: ABS61448.
2.
Image from Google Jackets
A needs-based methodology for classifying construction clients and selecting contractors by Series: Construction Management & Economics ; 16(1) January 1998 91-98 (8)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS58384.
3.
Image from Google Jackets
Validation of the model for evaluating client-generated risk by project consultants by Series: Construction Management & Economics ; 14(2) 1996, 131-145(15)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS55065.
4.
Image from Google Jackets
Organisational productivity: a case study of materials management in UK construction firms. by Series: Construction Papers ; 44Language: English
Publication details: Ascot Berks Chartered Institute of Building 1995
Availability: Items available for loan: London (1)Collection, call number: BOXED SET.
5.
Image from Google Jackets
A conceptual alternative to current tendering practice by Series: Building Research and Information ; 21(3) May/June 1993, 167-172(6)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: X971.
6.
Image from Google Jackets
Motivation and productivity of bricklayers by Series: Technical Information Service ; 115Language: English
Publication details: Ascot,Berks Chartered Institute of Building 1990
Availability: Items available for loan: London (1)Collection, call number: BOXED SET.