Your search returned 61 results.

Sort
Results
1.
Image from Google Jackets
Non-biological methods for assessment and remediation of contaminated land case studies by Series: CIRIA Report ; C588Language: English
Publication details: London CIRA 2003
Availability: Items available for loan: London (1)Collection, call number: CIRIA REPORTS.
2.
Image from Google Jackets
Target and cost-reimbursable construction contracts Part A:A study of their use and implications by Series: CIRIA Report ; R85
Edition: Rev ed.
Language: eng.
Publication details: London CIRA 2003
Availability: Items available for loan: London (1)Collection, call number: F692.8.
3.
Image from Google Jackets
Biological methods for assessment and remediation of contaminated land: case studies by Series: CIRIA Report ; C575Language: eng.
Publication details: London CIRIA 2002
Availability: Items available for loan: London (1)Collection, call number: CIRIA REPORTS.
4.
Image from Google Jackets
Faster construction on site by selection of methods and materials by Series: CIRIA Report ; C560Language: eng.
Publication details: London CIRIA 2001
Availability: Items available for loan: London (1)Collection, call number: CIRIA REPORTS.
5.
Image from Google Jackets
Bridge detailing guide by Series: CIRIA Report ; C543Language: eng.
Publication details: London CIRIA 2001
Availability: Items available for loan: London (1)Collection, call number: F690.598 SOU.
6.
Image from Google Jackets
Standardisation and pre-assembly : adding value to construction projects. by Series: CIRIA Report ; 176Language: English
Publication details: London CIRIA 1999
Availability: Items available for loan: London (1)Collection, call number: F693.97.
7.
Image from Google Jackets
Sealant joints in the external envelope of buildings : a guide to design, specification and construction. by Series: CIRIA Report ; 178Language: English
Publication details: London CIRIA 1998
Availability: Items available for loan: London (1)Collection, call number: F693.892.
8.
Image from Google Jackets
Management of gully pots for improved runoff quality. by Series: CIRIA Report ; 183Language: English
Publication details: London CIRIA 1998
Availability: Items available for loan: London (1)Collection, call number: F625.734.
9.
Image from Google Jackets
Pumping stations : design for improved buildability and maintenance. by Series: CIRIA Report ; 182Language: English
Publication details: London CIRIA 1998
Availability: Items available for loan: London (1)Collection, call number: F628.29.
10.
Image from Google Jackets
Screeds, floorings and finishes - selection, construction and maintenance. by Series: CIRIA Report ; 184Language: English
Publication details: London CIRIA 1998
Availability: Items available for loan: London (1)Collection, call number: CIRIA REPORTS.
11.
Image from Google Jackets
Hydraulic measures for the treatment and control of groundwater pollution. by Series: CIRIA Report ; 186Language: English
Publication details: London CIRIA 1998
Availability: Items available for loan: London (1)Collection, call number: F621.252.
12.
Image from Google Jackets
Regional seabed sediment studies and assessment of marine aggregate dredging. by Series: CIRIA Report ; C505Language: English
Publication details: London CIRIA 1998
Availability: Items available for loan: London (1)Collection, call number: F333.9164.
13.
Image from Google Jackets
Culvert design manual. by Series: CIRIA Report ; 168Language: English
Publication details: London CIRIA 1997
Availability: Items available for loan: London (1)Collection, call number: F625.734.
15.
Image from Google Jackets
Experiences of CDM. by Series: CIRIA Report ; 171Language: English
Publication details: London CIRIA 1997
Availability: Items available for loan: London (1)Collection, call number: CIRIA REPORTS.
16.
Image from Google Jackets
Integrity testing in piling practice. by Series: CIRIA Report ; 144Language: English
Publication details: London CIRIA 1997
Availability: Items available for loan: London (1)Collection, call number: 624.154.
17.
Image from Google Jackets
Design of containment systems for the prevention of water pollution from industrial incidents. by Series: CIRIA Report ; 164Language: English
Publication details: London CIRIA 1997
Availability: Items available for loan: London (1)Collection, call number: F628.1683.
18.
Image from Google Jackets
Ground engineering spoil : good management practice. by Series: CIRIA Report ; 179Language: English
Publication details: London CIRIA 1997
Availability: Items available for loan: London (1)Collection, call number: CIRIA REPORTS.
19.
Image from Google Jackets
Inland dredging : guidance on good practice. by Series: CIRIA Report ; 169Language: English
Publication details: London CIRIA 1997
Availability: Items available for loan: London (1)Collection, call number: F627.73.
20.
Image from Google Jackets
Valves, pipework and associated equipment in dams : guide to condition assessment. by Series: CIRIA Report ; 170Language: English
Publication details: London CIRIA 1997
Availability: Items available for loan: London (1)Collection, call number: 627.8.