Image from Google Jackets

PFI trailblazers

By: Language: English Series: Building ; 260(7913) 20 October 1995, 22-24(3)Publication details: 1995Subject(s): Summary: Examines two of the `most advanced` PFI projects. Looks at the considerations Costain made when putting together their bid for Bridgend prison - and the anatomy of the whole design-construct-manage-finance consortium. Reports on how Laing believe that the Midland Metro project - to which they have signed the build and operate contract - is a `blueprint for unlocking PFI`.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS53757 (Browse shelf(Opens below)) 1 Available 6443-1001

Examines two of the `most advanced` PFI projects. Looks at the considerations Costain made when putting together their bid for Bridgend prison - and the anatomy of the whole design-construct-manage-finance consortium. Reports on how Laing believe that the Midland Metro project - to which they have signed the build and operate contract - is a `blueprint for unlocking PFI`.