Your search returned 6 results.

Sort
Results
1.
Image from Google Jackets
An integrated regression analysis and time series model for construction tender price index forecasting by Series: Construction Management and Economics ; (22) June 2004, 483-493(11)
Publication details: 2004
Availability: Items available for loan: London (1)Collection, call number: ABS67995.
2.
Image from Google Jackets
BCIS building cost index models by Series: BCIS Building Cost Index Models | BCIS Bulletin Service | BCIS Special StudyLanguage: English
Publication details: London BCIS 1997-
Availability: No items available.
3.
Image from Google Jackets
Narrow margins by Series: New Civil Engineer ; (1104) 27 October 1994, 24-25(2)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS51496.
4.
Image from Google Jackets
Tender/building cost forecast by Series: Building Economist ; January 1994, 12-14(3)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS49908.
5.
Image from Google Jackets
Making the right choice by Series: Chartered Quantity Surveyor ; 14(3) November 1991, 12-13(2)Language: English
Publication details: 1991
Availability: Items available for loan: London (1)Collection, call number: ABS45383.
6.
Image from Google Jackets
Construction cost and price indices: description and use by Language: English
Publication details: London E and F N Spon 1981
Availability: Items available for loan: London (1)Collection, call number: 692.5.