Channel changer
Language: English Series: Building ; 257(7747) 29 May 1992, 38-42(5)Publication details: 1992Subject(s): Summary: Cheriton terminal for the Channel Tunnel is being designed as it is being built, thus creating enormous demands for the construction team and cost consultants. This article reports on the design, costing, planning and environmental impact of the terminal`s erection and the claims arising from it.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS46341 (Browse shelf(Opens below)) | 1 | Available | 57890-1001 |
Cheriton terminal for the Channel Tunnel is being designed as it is being built, thus creating enormous demands for the construction team and cost consultants. This article reports on the design, costing, planning and environmental impact of the terminal`s erection and the claims arising from it.