Your search returned 6 results.

Sort
Results
1.
Image from Google Jackets
Factors of construction time Construction cost vs. gross floor area [electronic resource] by Series: COBRA ; 2013Language: English
Publication details: London RICS 2013
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
2.
Image from Google Jackets
The impact of variation orders in the construction phase in the Saudi construction industry case studies [electronic resource] by Series: COBRA ; 2013Language: English
Publication details: London RICS 2013
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
3.
Image from Google Jackets
Construction time prediction: the forgotten service by Series: Cost Engineer ; 40(4) September 2002, 7-11(5)
Publication details: 2002
Availability: Items available for loan: London (1)Collection, call number: ABS66018.
4.
Image from Google Jackets
Lean summit Series: Building ; 263(26) 26 June 1998, 12(1)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: WB3425-07.
5.
Image from Google Jackets
Why some buildings are built faster by Series: Building Economist ; December 1994, 5-8(4)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS51993.
6.
Image from Google Jackets
Time-cost planning of construction by Series: RICS Research Paper Series ; (33)Language: English
Publication details: London RICS 1993
Availability: Items available for loan: London (3)Collection, call number: RICS 1993/95, ...