Image from Google Jackets

Allowance, contingencies and reserves

By: Series: Construction Economist ; 13(1) March 2003, 10-11(2)Publication details: 2003Subject(s): Summary: Establishes a classification for the terms allowance, contingency and reserve, as used in construction, project and program estimating. Criteria are set out as primary, secondary and subsidiary levels. Table.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS66637 (Browse shelf(Opens below)) 1 Available 122123-1001

Establishes a classification for the terms allowance, contingency and reserve, as used in construction, project and program estimating. Criteria are set out as primary, secondary and subsidiary levels. Table.