Design and build - effects of contractor design on highway schemes
Language: English Series: Proceedings of the Institution of Civil Engineers ; 108(2) May 1995, 64-76(13)Publication details: 1995Subject(s):- BUILDING PROJECTS
- CONTRACTOR DESIGN
- DARTFORD-THURROCK CROSSING
- DBFO SCHEMES
- DESIGN AND BUILD
- DESIGN AND CONSTRUCT
- DESIGN BUILD FINANCE AND OPERATE SCHEMES
- HIGHWAYS AGENCY
- ROAD SCHEMES
- PROPERTY-INFRASTRUCTURE-TRANSPORT INFRASTRUCTURE-ROAD INFRASTRUCTURE
- SECOND SEVERN CROSSING
- TRANSPORT CONTRACTS
- BUILT ENVIRONMENT-BUILDING CONTRACT FORMS
- TRANSPORT AND COMMUNICATIONS
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS52653 (Browse shelf(Opens below)) | 1 | Available | 88801-1001 |
Traces the growth in design and build and the part played in its growth by the NAO report on cost overruns and by the private finance initiative. Also examines the changing role of the engineer.