Your search returned 9 results.

Sort
Results
1.
Image from Google Jackets
Significance of the people factor in early stage estimating of project costs [electronic resource] by Series: COBRA ; 2013Language: English
Publication details: London RICS 2013
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
2.
Image from Google Jackets
An integrated regression analysis and time series model for construction tender price index forecasting by Series: Construction Management and Economics ; (22) June 2004, 483-493(11)
Publication details: 2004
Availability: Items available for loan: London (1)Collection, call number: ABS67995.
3.
Image from Google Jackets
What's the damage? by Series: Building ; 267(8246) 9 August 2002, 43(1)
Publication details: 2002
Availability: Items available for loan: London (1)Collection, call number: ABS65977.
4.
Image from Google Jackets
Informing the decision makers on the cost and value of green building by Series: Building Research and Information ; 28 (5/6) 2000, 315-324(10)
Publication details: 2000
Availability: Items available for loan: London (1)Collection, call number: ABS62967.
5.
Image from Google Jackets
Preliminary cost estimation of highway construction using neural networks by Series: Cost Engineering ; 41 (3) March 1999, 19-24(6)Language: English
Publication details: 1999
Availability: Items available for loan: London (1)Collection, call number: ABS60421.
6.
Image from Google Jackets
Risk analysis checklist by Series: Cost Engineer ; 35(3) May 1997, 7-9(3)Language: English
Publication details: 1997
Availability: Items available for loan: London (1)Collection, call number: ABS57033.
7.
Image from Google Jackets
Copthorne Hotel (Newcastle) Ltd v Arup Associates Series: Construction Industry Law Letter ; [1996] CILL 1193-1196(4)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: X3797.
8.
Image from Google Jackets
Rules on tendering ignored Series: Building ; 259(7850) 1 July 1994, 16(1)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: WB3025-06.
9.
Image from Google Jackets
Consultant cost control in the Pacific Rim by Series: Cost Engineering ; 34(1) January 1992, 17-24(8)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: ABS45767.