Your search returned 35 results.

Sort
Results
1.
Image from Google Jackets
Cost studies of buildings [electronic resource] by
Edition: 6th ed.
Language: eng.
Publication details: Harlow Taylor and Francis Ltd 2015
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
2.
Image from Google Jackets
Cost studies of buildings by
Edition: 5th ed.
Language: eng.
Publication details: Harlow Pearson Education Ltd 2010
Availability: Items available for loan: London (1)Collection, call number: 690.23 ASH.
3.
Image from Google Jackets
Re-engineering the whole life cycle process by Series: Construction Management and Economics ; 23(1) January 2005, 9-14(6)
Publication details: 2005
Availability: Items available for loan: London (1)Collection, call number: X129111.
4.
Image from Google Jackets
Professional judgement and the mapping of the building project price forecasting process by Series: RICS Foundation Research Papers ; 4(24)Language: English
Publication details: London RICS Foundation 2004
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
5.
Image from Google Jackets
Cost studies of buildings [electronic resource] by
Edition: 4th ed.
Language: eng.
Publication details: Harlow Pearson Education Ltd 2004
Availability: Items available for loan: Virtual (1)Collection, call number: EBOOK.
6.
Image from Google Jackets
Sources of international cost data and location cost modelling by Series: Cost Engineer ; 41(5) September 2003, 15-20(6)
Publication details: 2003
Availability: Items available for loan: London (1)Collection, call number: ABS67120.
7.
Image from Google Jackets
Data modelling and the application of a neural network approach to the prediction of total construction costs by Series: Construction Management and Economics ; 20(6) 2002, 465-472 (8)
Publication details: 2002
Availability: Items available for loan: London (1)Collection, call number: ABS65903.
8.
Image from Google Jackets
Quantifying and managing disruption claims by
Publication details: London Thomas Telford 2002
Availability: Items available for loan: London (1)Collection, call number: 692.8 LAL.
9.
Image from Google Jackets
3D CAD systems and cost engineering by Series: Cost Engineer ; 39(5) May 2001, 18-21(4)
Publication details: 2001
Availability: Items available for loan: London (1)Collection, call number: X113248.
10.
Image from Google Jackets
Construction scheduling, cost optimization and management: a new model based on neurocomputing and object technologies. by
Publication details: London Spon Press 2001
Availability: Items available for loan: London (1)Collection, call number: 692.5 ADE.
11.
Image from Google Jackets
Estimating using cost significant global cost models by Series: Construction Management and Economics ; (18) June 2000, 575-585(11)
Publication details: 2000
Availability: Items available for loan: London (1)Collection, call number: ABS62566.
12.
Image from Google Jackets
Model selection criteria and the building project price forecasting process by Series: RICS Foundation Research Papers ; 3(16)
Publication details: London RICS Research Foundation 2000
Online resources:
Availability: Items available for loan: London (3)Collection, call number: RICS 2000/80, ... Virtual (1)Collection, call number: ONLINE PUBLICATION.
14.
Image from Google Jackets
Cost studies of buildings. by
Edition: 3rd
Language: ENG
Publication details: Harlow Longman 1999
Availability: Items available for loan: London (1)Collection, call number: SHELF 329.
15.
Image from Google Jackets
Statistical analysis and cost models development for tender price estimation. by
Publication details: London RICS 1999
Availability: Items available for loan: London (2)Collection, call number: RICS 1999/68, ...
16.
Image from Google Jackets
Building in value: pre-design issues. by Language: ENG
Publication details: London Arnold 1999
Availability: Items available for loan: London (1)Collection, call number: 658.404 BES.
17.
Image from Google Jackets
Cost modelling in the construction industry by Series: Building Engineer ; 73(2) March 1998, 24-26(3)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS58401.
18.
Image from Google Jackets
Make the most of IT to improve cost planning by Series: CSM ; 7(8) May 1998, 44-45(2)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS58667.
19.
Image from Google Jackets
A price on design. Production based design cost modelling in design and build organisations. by Language: English
Publication details: London RICS 1998
Availability: Items available for loan: London (4)Collection, call number: RICS 1998/92, ...
20.
Image from Google Jackets
Cost modelling procurement project Series: Contract Journal ; 384(6079) 13 June 1996, 6(1)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: WB3224-04.