Your search returned 6 results.

Sort
Results
1.
Image from Google Jackets
The sustainable facility design process: getting capital and recurrent cost right by Series: Building Economist ; March 2003, 4-9(6)
Publication details: 2003
Availability: Items available for loan: London (1)Collection, call number: ABS66604.
2.
Image from Google Jackets
Drive for improvement by Series: Architects' Journal ; 214(4) 26 July 2001, 46-47(2)
Publication details: 2001
Availability: Items available for loan: London (1)Collection, call number: ABS64327.
3.
Image from Google Jackets
Clients want more accurate early cost forecasting by Series: CSM (Chartered Surveyor Monthly) ; 8(6) February 1999, 48-49(2)Language: English
Publication details: 1999
Availability: Items available for loan: London (1)Collection, call number: ABS59891.
4.
Image from Google Jackets
Conceptual cost estimating manual by
Edition: 2nd ed.
Language: eng.
Publication details: Houston, Tex. Gulf Publishing Company 1997
Availability: Items available for loan: London (1)Collection, call number: 692.5 PAG.
5.
Image from Google Jackets
Structural Eurocode Series: New Builder ; (250) 17 March 1995, 5(1)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: WB3112-05.
6.
Image from Google Jackets
Managing architectural design - a recent survey by Series: Construction Management & Economics ; 10(6) November 1992, 479-487(9)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: X293.