Your search returned 6 results.

Sort
Results
1.
Image from Google Jackets
Recovery of contractor's fixed cost/head office overhead and profit by Series: Civil Engineering Surveyor ; June 2004, 17-19(3)
Publication details: 2004
Availability: Items available for loan: London (1)Collection, call number: ABS67887.
2.
Image from Google Jackets
Recovery by formulae of head office overheads: a case for re-engineering by Series: Arbitration ; 66(3) August 2000, 199-201(4)
Publication details: 2000
Availability: Items available for loan: London (1)Collection, call number: ABS62818.
3.
Image from Google Jackets
Calculating the overheads when a job has hit delays by Series: Construction News ; (6693) 23 November 2000, 31(1)
Publication details: 2000
Availability: Items available for loan: London (1)Collection, call number: ABS63257.
4.
Image from Google Jackets
The use of formulae in head office overhead claims in building contracts by Series: Campus Construction ; March 1997, 14-16(3)Language: English
Publication details: 1997
Availability: Items available for loan: London (1)Collection, call number: ABS56803.
5.
Image from Google Jackets
Not always a formula for success by Series: New Civil Engineer ; (1171) 25 April 1996, 38(1)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS54864.
6.
Image from Google Jackets
What might have been by Series: Building ; 260(7887) 7 April 1995, 33(1)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52659.