Your search returned 14 results.

Sort
Results
1.
Image from Google Jackets
Measuring construction Prices, output and productivity [electronic resource] by Language: English
Publication details: Oxon Routledge Taylor and Francis 2015
Availability: Items available for loan: Virtual (1)Collection, call number: EBOOK.
2.
Image from Google Jackets
Discounted cash flow - estimation of the remaining useful life in real estate by Series: Surveyors' Times [Hong Kong Institute of Surveyors] ; 12(6) June 2003, 8(1)
Publication details: 2003
Availability: Items available for loan: London (1)Collection, call number: ABS66941.
3.
Image from Google Jackets
Real estate appraisal: a review of valuation methods by Series: Journal of Property Investment and Finance ; 21(4) 2003, 383-401(19)
Publication details: 2003
Availability: Items available for loan: London (1)Collection, call number: ABS67113.
4.
Image from Google Jackets
When you are in a hole...don't dig. Series: RAC Foundation Press Release ; 7 November 2003 (3)
Publication details: 2003
Availability: Items available for loan: London (2).
5.
Image from Google Jackets
Civil engineering project management by
Edition: 4th ed.
Language: English
Publication details: Oxford Butterworth-Heinemann 2003
Availability: Items available for loan: London (1)Collection, call number: 658.404 TWO.
6.
Image from Google Jackets
How to pick a fight by Series: Building ; 266(8172) 9 March 2001, 58(1)
Publication details: 2001
Availability: Items available for loan: London (1)Collection, call number: ABS63683.
7.
Image from Google Jackets
Integrated probabilistic schedules and estimates from project simulated data by Series: Construction Management and Economics ; 19(4) July 2001, 417-426(10)
Publication details: 2001
Availability: Items available for loan: London (1).
8.
Image from Google Jackets
The effect of seasonality of valuations on property risk by Series: Journal of Property Research ; 15(3) September 1998, 167-182(16)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS59270.
9.
Image from Google Jackets
A research methodology for modelling construction design service costs by Series: Journal of Construction Procurement ; 3(3) November 1997, 47-67(21)Language: English
Publication details: 1997
Availability: Items available for loan: London (1)Collection, call number: ABS58130.
10.
Image from Google Jackets
Understanding the Chinese construction costing system by Series: Cost Engineering ; 38(1) January 1996, 19-21(3)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS54587.
11.
Image from Google Jackets
Risk estimation and appraisal-smoothing in UK property returns by Series: Journal of Property Research ; 13(1) March 1996, 1-12(12)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: ABS54728.
12.
Image from Google Jackets
Multiple regression in property analysis by Series: Estates Gazette ; (9506) 11 February 1995, 144-146(3)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52375.
13.
Image from Google Jackets
More than you bargained for by Series: Building ; 260(7890) 28 April 1995, 39(1)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52661.
14.
Image from Google Jackets
Intelligent cost/schedule estimation for modular construction by Series: Cost Engineering ; 35(6) June 1993, 19-25(7)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: ABS48909.