Your search returned 8 results.

Sort
Results
1.
Image from Google Jackets
Recovery of contractor's fixed cost/head office overhead and profit by Series: Civil Engineering Surveyor ; June 2004, 17-19(3)
Publication details: 2004
Availability: Items available for loan: London (1)Collection, call number: ABS67887.
2.
Image from Google Jackets
Foreseeability of damages by Series: Contract Journal ; 424(0483) 7 July 2004, 26(1)
Publication details: 2004
Availability: Items available for loan: London (1)Collection, call number: ABS68082.
3.
Image from Google Jackets
How to cut your losses by Series: Construction News ; (6580) 27 August 1998, 19(1)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS59133.
4.
Image from Google Jackets
A reasonable settlement? by Series: Contract Journal ; 396(6201) 11 November 1998, 33(1)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS59581.
5.
Image from Google Jackets
Factorset Ltd v Selby DC Series: Estates Gazette ; (1995) 40 EG 133-138(6)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS53730.
6.
Image from Google Jackets
Recovery without a cause by Series: Building Economist ; July 1994, 18(1)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS51016.
7.
Image from Google Jackets
Balfour Beatty Construction (Scotland) Limited v Scottish Power plc Series: Construction Industry Law Letter ; (1994) CILL 925-926(2)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: X1562.
8.
Image from Google Jackets
Recovering bank charges Series: Times ; 4 May 1994, 39(1)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: WB3017-05.