Your search returned 14 results.

Sort
Results
1.
Image from Google Jackets
Factors of construction time Construction cost vs. gross floor area [electronic resource] by Series: COBRA ; 2013Language: English
Publication details: London RICS 2013
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
2.
Image from Google Jackets
Significance of the people factor in early stage estimating of project costs [electronic resource] by Series: COBRA ; 2013Language: English
Publication details: London RICS 2013
Availability: Items available for loan: Virtual (1)Collection, call number: ONLINE PUBLICATION.
3.
Image from Google Jackets
Are the contracts working together? by Series: Estates Gazette ; (0416) 17 April 2004, 102-104(3)
Publication details: 2004
Availability: Items available for loan: London (1)Collection, call number: ABS67695.
4.
Image from Google Jackets
How to reduce your project cost by Series: Cost Engineer ; 41(1) February 2003, 16-21(6)
Publication details: 2003
Availability: Items available for loan: London (1)Collection, call number: ABS66472.
5.
Image from Google Jackets
Deploying supply chain management by Series: Building Engineer ; 78(3) March 2003, 28-29(2) | Building Engineer ; 78(4) April 2003, 32-35(4)
Publication details: 2003
Availability: Items available for loan: London (1)Collection, call number: ABS66553.
6.
Image from Google Jackets
The sustainable facility design process: getting capital and recurrent cost right by Series: Building Economist ; March 2003, 4-9(6)
Publication details: 2003
Availability: Items available for loan: London (1)Collection, call number: ABS66604.
7.
Image from Google Jackets
Construction KPIs published Series: BCIS Press Release ; August 2002, (2)
Publication details: 2002
Availability: Items available for loan: London (1)Collection, call number: WB3831-02.
8.
Image from Google Jackets
Building design cost management by
Publication details: Oxford Blackwell 2002
Availability: Items available for loan: London (1)Collection, call number: 658.1552 JAG.
9.
Image from Google Jackets
Thousands join warranty Series: Contract Journal ; 402 (6267) 8 March 2000, 9(1)
Publication details: 2000
Availability: Items available for loan: London (1)Collection, call number: WB3610-08.
10.
Image from Google Jackets
Risk analysis checklist by Series: Cost Engineer ; 35(3) May 1997, 7-9(3)Language: English
Publication details: 1997
Availability: Items available for loan: London (1)Collection, call number: ABS57033.
11.
Image from Google Jackets
PFI lauded as a welcome novation Series: Financial Times ; 25 November 1996, 10(1)Language: English
Publication details: 1996
Availability: Items available for loan: London (1)Collection, call number: WB3245-15.
12.
Image from Google Jackets
Setting sights by Series: New Builder ; (258) 19 May 1995, 18-22(4)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52816.
13.
Image from Google Jackets
Managing architectural design - a recent survey by Series: Construction Management & Economics ; 10(6) November 1992, 479-487(9)Language: English
Publication details: 1992
Availability: Items available for loan: London (1)Collection, call number: X293.
14.
Image from Google Jackets