Your search returned 5 results.

Sort
Results
1.
Image from Google Jackets
Delaying tactics by Series: Contract Journal ; 378(6023) 4 May 1995, 16(1)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52809.
2.
Image from Google Jackets
Pleading rolled-up claims by Series: Building ; 260(78790 10 February 1995, 37(1)Language: English
Publication details: 1995
Availability: Items available for loan: London (1)Collection, call number: ABS52227.
3.
Image from Google Jackets
Prolongation and disruption - problems of causation for the construction industry. by Series: Construction Papers ; 56Language: English
Publication details: Ascot Chartered Institute of Buildings 1995
Availability: Items available for loan: London (1)Collection, call number: BOXED SET.
4.
Image from Google Jackets
Legal arguments - warming to global claims by Series: Building ; 258(7799) 18 June 1993, 23(1)Language: English
Publication details: 1993
Availability: Items available for loan: London (1)Collection, call number: ABS48765.
5.
Image from Google Jackets
Wharf Properties v Eric Cumine Associates: the effect on rolled-up claims by Series: Construction Law Journal ; 7 (4) 1991, 303-309(7)Language: English
Publication details: 1991
Availability: Items available for loan: London (1)Collection, call number: ABS45395.