| 000 | 00817cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS39279 | ||
| 008 | 090401t1988 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u15668 | ||
| 041 | _aeng | ||
| 100 | _aTerry, E. | ||
| 245 | _aAvoiding damp | ||
| 260 | _c1988 | ||
| 350 | _a0 | ||
| 490 |
_aChartered Quantity Surveyor _v10(10) June 1988, 22 (1) |
||
| 520 | _aFocuses on the problem of damp in new buildings, showing how contractors or their specifiers can combat it by accepting the possibility that it will occur and selecting materials accordingly. Goes on to describe surface and interstitial condensation and looks at ways of minimising their occurrence. | ||
| 650 | _aBUILDING DEFECTS | ||
| 650 | _aCEILINGS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING PATHOLOGY | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c10301 _d10301 |
||