| 000 | 01560cam a2200325 4500 | ||
|---|---|---|---|
| 001 | L128459 | ||
| 008 | 050106n2003 000 0 eng u | ||
| 020 | _a0860172457 | ||
| 035 | _a(Sirsi) u128459 | ||
| 041 | _aeng. | ||
| 050 |
_a692.8 _c18 |
||
| 110 |
_aConstruction Industry Research and Information Association _94810 |
||
| 245 |
_aTarget and cost-reimbursable construction contracts _bPart A:A study of their use and implications |
||
| 250 | _aRev ed. | ||
| 260 |
_aLondon _bCIRA _c2003 |
||
| 300 |
_a42p. _c30cm. |
||
| 350 | _a20 | ||
| 490 |
_aCIRIA Report _vR85 |
||
| 520 | _aThis report is based on visits to 50 firms and organisations, and includes 25 case studies which illustrate the advantages and problems associated with the various forms of target and cost-reimbursable contract. Seperate consideration is given to: when to use cost-reimbursable contracts; methods of introducing competition at the tendering stage; targets and incentives for cost, time and quality; and the implications of their use. The establishment of a joint planning team is recommended and the merits of open-book accounting emphasised, particularly in relation to work for publicly-accountable clients. Formerly report 56. | ||
| 520 | _aSupercedes (L148284). | ||
| 650 |
_aContracts _96232 |
||
| 650 | _aLUMP SUM CONTRACTS | ||
| 650 | _aREIMBURSABLE CONTRACTS | ||
| 650 | _aTARGET COST CONTRACTS | ||
| 650 | _aTENDERING | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 700 | _aPerry, J.G. | ||
| 700 | _aThompson, P.A. | ||
| 942 | _n0 | ||
| 999 |
_c103915 _d103915 |
||