000 01674cam a2200325 4500
008 #DATE n2004 000 0 eng u
020 _a0860176037
035 _a(Sirsi) u128498
041 _aeng
050 _a690.22
_c18
100 _aGilbertson, Alan
245 _aCDM Regulations
_bpractical guidance for planning supervisors
250 _a2nd ed.
260 _aLondon
_bCIRIA
_c2004
300 _a84p.
_b30cm.
350 _a50
490 _aCIRIA Publication
_vC603
520 _aExamines the duties of a planning supervisor under the Construction (Design and Management) Regulations 1994. Includes guidance on difficult issues that arise in practice including: appointment; HSE notification; competence and resources; interaction with designers; pre-tender health and safety plans; liaison with principal contractors; health and safety files; and different types of client, project and construction procurement. Glossary and references.
520 _aThis second edition takes account of the 2001 HSE document, "Managing health and safety in construction: Construction (Design and Management) Regulations 1994 - approved code of practice and guidance" (ISBN 0717621391).
650 _aCONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 1994
650 _aCONSTRUCTION MANAGEMENT
_96230
650 _aCDM REGULATIONS
650 _aHEALTH AND SAFETY
_96244
650 _aPLANNING SUPERVISORS
690 _aBUILT ENVIRONMENT-BUILDING STANDARDS
710 _aWS Atkins Consultants Ltd
_93623
710 _aConstruction Industry Research and Information Association
_94810
710 _aUnited Kingdom
_bDepartment of Trade and Industry
942 _n0
999 _c103935
_d103935