000 01127cam a2200277 4500
008 050113n2003 000 0 eng u
020 _a1860816150
035 _a(Sirsi) u128508
041 _aeng
050 _a614.76
_c18
110 _aBRE Centre for Resource Management
_94668
245 _aConstruction and demolition waste
_bpart 2
260 _aWatford
_bBRE
_c2003
300 _a8p.
_bill.
_c30cm.
350 _a12
490 _aBRE Good Building Guide
_vGBG 57 Part 2
520 _aPart two of this "Good Building Guide" provides advice on how to deal with waste during the demolition and construction process. For demolition waste, this involves planning ahead, materials reclamation, and materials reuse. For construction waste, segregation of waste and various waste management tools are discussed.
650 _aDEMOLITION WASTE
650 _aCONSTRUCTION WASTE
650 _aWASTE MANAGEMENT
650 _aBEST PRACTICAL ENVIRONMENTAL OPTION
690 _aBUILT ENVIRONMENT
710 _aBuilding Research Establishment
710 _aUnited Kingdom
_bDepartment of Trade and Industry
942 _n0
999 _c103942
_d103942