| 000 | 00715cab a2200229 4500 | ||
|---|---|---|---|
| 001 | WB2612-47 | ||
| 008 | 090401t1990 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u15841 | ||
| 041 | _aeng | ||
| 245 | _aFranco-British group build Severn bridge | ||
| 260 | _c1990 | ||
| 350 | _a0 | ||
| 490 |
_aFinancial Times _v22/3/90 p11 |
||
| 520 | _aThe DTp has selected John Laing and the French engineering group, GTM Entrepose to build the Severn toll bridge , required to cope with the greater volume of traffic to S.Wales. | ||
| 650 | _aFINANCE | ||
| 650 | _aFRANCE | ||
| 650 | _aJOINT VENTURES | ||
| 650 | _aPRIVATE SECTOR | ||
| 690 | _aTRANSPORT AND COMMUNICATIONS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c10426 _d10426 |
||