| 000 | 01356cam a2200229 4500 | ||
|---|---|---|---|
| 001 | ##L132363 | ||
| 008 | 060125n2002 000 0 eng u | ||
| 020 | _a1903287294 | ||
| 035 | _a(Sirsi) u132363 | ||
| 041 | 0 | _aeng | |
| 050 | 0 | 4 | _a697.507 $2 18 |
| 100 | 1 | _aArmstrong, J. | |
| 245 | 0 | 0 |
_aBoilers _bCIBSE commissioning code B |
| 260 |
_aLondon _bThe Chartered Institution of Building Services Engineers _c2002 |
||
| 300 |
_a34p _btables _c30cm |
||
| 350 | _a43 | ||
| 505 | 2 | _aIntroduction -- Safety issues -- Design for ease of commissioning -- Specification issues -- Commissioning project management -- Sequence of commissioning -- Planning and programming -- Pre-commissioning verification and inspection -- Activation, dry and live runs -- Operation and calibration -- Recording data, reporting and training -- System handover. | |
| 520 | _aContains recommendations and guidance relating to the work stages required for the commissioning of boiler systems. Applies to individual hot water boilers (including condensing type) burning natural gas and/or BS 2869 gas oil with rated inputs of between 60 kW and 2 mW, and is equally applicable to new-build and retrofit applications. | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING SERVICES-BUILDING SERVICES ENGINEERING-HEATING AND VENTILATION ENGINEERING | ||
| 700 | 1 | _aMachin, G. T. | |
| 942 | _n0 | ||
| 999 |
_c105105 _d105105 |
||