000 01371cam a2200205 4500
001 ##L132369
008 060125n2002 000 0 eng u
020 _a1903287286
035 _a(Sirsi) u132369
041 0 _aeng
050 0 4 _a697.931 2(218)
100 1 _aWelch, Terry
245 0 0 _aRefrigerating systems
_bCIBSE commissioning code R
260 _aLondon
_bChartered Institute of Building Services Engineers
_c2002
300 _a41p
_bdiagrams, tables
_c30cm.
350 _a43
520 _aProvides recommendations and guidance on current standards of good commissioning practice for refrigerating plant and associated equipment used in air conditioning systems. Discusses safety issues, design for commissionability, specification, commissioning project management, pre-commissioning, combined pressure and leak testing, setting to work and adjusting, test apparatus and instruments, refrigerant recovery and disposal, and absorption systems. Appendices cover environmental and energy issues in refrigeration, alternatives to chlorofluorcarbons (CFC's) and hydrochlorofluorcarbons (HCFC's) variable refrigerant volume (VRV) and variable refrigerant flow (VRF) systems, and commissioning records.
690 _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS
942 _n0
999 _c105110
_d105110