100 1 _aCheung, Fiona Y.K.
245 0 0 _aSuccess factors in an alliancing contract
_ba case study in Australia
_h[electronic resource]
260 _c2005
490 0 _aCOBRA
_v2005
520 _aReports the findings of a survey undertaken with a private organisation based on an alliance project during its design stage, identifying the critical factors that influence the success of the project. Concludes that there needs to be a change of culture and attitude in the construction industry, moving away from traditional adversarial relationship into cooperative and collaborative relationship.
651 4 _aAUSTRALIA
690 _aConstruction management
_96230
700 1 _aRowlinson, Steve
856 4 0 _uhttps://www.rics.org/site/scripts/download_info.aspx?downloadID=2575
_zView the item free of charge at www.rics.org...