| 100 | 1 | _aWong, Franky W.H. | |
| 245 | 0 | 0 |
_aOptimising procurement approaches to address "constructability" problems _h[electronic resource] |
| 260 | _c2005 | ||
| 490 | 0 |
_aCOBRA _v2005 |
|
| 520 | _aDiscusses the effects of different procurement methods on constructability, such as those of design-bid-build, design and build, develop and construct, and management contracting. Reports that early involvement of contractors in the design stage, allowing enough time for design and tender activities increases constructability. | ||
| 590 | _aKA | ||
| 651 | 4 | _aInternational | |
| 690 |
_aProcurement _96260 |
||
| 700 | 1 | _aLam, Patrick T.I. | |
| 700 | 1 | _aChan, Edwin H.W. | |
| 711 | 2 |
_aConstruction and Building Research Conference _cUniversity of Queensland, Brisbane _d4-5 July 2005 |
|
| 856 | 4 | 0 |
_uhttps://www.rics.org/site/scripts/download_info.aspx?downloadID=2573 _zView the item free of charge at www.rics.org... |
| 942 | _n0 | ||
| 999 |
_c106962 _d106962 |
||