000 01169cam a22002415a 4500
001 L138356
008 070531e2006 xxk f 100 0 eng d
035 _a(Sirsi) u138356
041 0 _aeng
100 1 _aPalliyaguru, R.
245 0 0 _aReview of impact of post-tsunami reconstruction and rehabilitation on infrastructure facilities
_h[electronic resource]
260 _aLondon
_bRICS
_c2006
490 0 _aCOBRA
_v2006
520 _aDiscusses the impact of the Tsunami on infrastructure facilities in Sri Lanka, and the short and long-term assistance provided to communities for the rebuilding of their infrastructure and housing. Reports that after almost one and a half years, the Tsunami rehabilitation process is slow as compared to its start.
651 4 _aSRI LANKA
690 _aPROPERTY-INFRASTRUCTURE
690 _aBUILT ENVIRONMENT
700 1 _aAmaratunga, D.
700 1 _aHaigh, R.
711 2 _aConstruction and Building Research Conference
_cUniversity College London, London
_d7-8 September 2006
856 4 0 _uhttps://www.rics.org/site/scripts/download_info.aspx?downloadID=2953
_zView the item free of charge at www.rics.org...
942 _n0
999 _c107143
_d107143