000 00768cab a2200193 4500
001 ABS39435
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u16699
041 _aeng
100 _aKeeler, D.
245 _aLondon gets a better water supply
260 _c1988
350 _a0
490 _aConstruction News
_v(6066) 9 June 1988, 20-21(2)
520 _aReports on the construction of London `s ring main, the system being developed by Thames Water Authority to improve the capital`s water supplies. Modernised treatment works are being linked to the major demand centres by means of the gravity fed ring main. Describes a visit to one of the sites where tunnelling is underway.
690 _aWATER
942 _n0
948 _c04/03/1997
999 _c11030
_d11030