000 00848cab a2200217 4500
001 ABS39461
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u16928
041 _aeng
100 _aAbdullah, R. Z.
245 _aMeeting the problems of cost control systems
260 _c1988
350 _a0
490 _aBuilding Technology & Management
_v24(4) August/September 1988, 14-16(3)
520 _aReports on the results of research by Loughborough University on cost control and monitoring systems currently used in construction companies to compare real-life requirements of users and the theoretical aspects of cost control. The aim is to develop an improved system. References.
650 _aCOMPUTERS
690 _aBUILT ENVIRONMENT-BUILDING COSTS
700 _aTyler, A.H.
942 _n0
948 _c04/03/1997
999 _c11212
_d11212