| 000 | 00848cab a2200217 4500 | ||
|---|---|---|---|
| 001 | ABS39461 | ||
| 008 | 090401t1988 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u16928 | ||
| 041 | _aeng | ||
| 100 | _aAbdullah, R. Z. | ||
| 245 | _aMeeting the problems of cost control systems | ||
| 260 | _c1988 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Technology & Management _v24(4) August/September 1988, 14-16(3) |
||
| 520 | _aReports on the results of research by Loughborough University on cost control and monitoring systems currently used in construction companies to compare real-life requirements of users and the theoretical aspects of cost control. The aim is to develop an improved system. References. | ||
| 650 | _aCOMPUTERS | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 700 | _aTyler, A.H. | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c11212 _d11212 |
||