| 000 | 01501cad a22002415a 4500 | ||
|---|---|---|---|
| 001 | L155909 | ||
| 008 | 120420s2012 xxk 000 0 eng d | ||
| 035 | _a(Sirsi) u155909 | ||
| 041 | 0 | _aeng | |
| 110 | 2 |
_aGreat Britain _bHealth and Safety Executive |
|
| 245 | 0 | 0 |
_aEvaluation of the construction (design and management) regulations 2007 _bpart 1 main report _h[electronic resource] |
| 260 |
_a[S.l.] _bHSE _c2012 |
||
| 490 | 0 |
_aResearch Report _b920 |
|
| 505 | _aKey messages -- Executive summary -- Introduction -- Aims and objectives of this report -- Changes between CDM 1994 and CDM 2007 -- What works well and what does not work well with CDM 2007 -- Impact of industry practice on CDM 2007 -- Commercial pressures drive the procurement process and limit the level of compliance with CDM 2007 -- Cost implications of CDM 2007 | ||
| 520 | _aThis report is the output from an evaluation in 2010 and asks to what extent have the 2007 regulations met HSE's objectives for these regulations, as distinct from the earlier 1994 regulations, and what are the cost implications for the construction industry of CDM 2007? A summary of the findings is contained within this report. | ||
| 590 | _aKA NTK | ||
| 651 | 4 |
_aGreat Britain _y1707- |
|
| 690 |
_aConstruction management _96230 |
||
| 690 | _aDesign and specification | ||
| 710 | 1 |
_aFrontline Consultants _95690 |
|
| 856 | 4 | 0 |
_uhttps://www.hse.gov.uk/research/rrpdf/rr920.pdf _zView the report free of charge at www.www.hse.gov.uk |
| 942 | _n0 | ||
| 999 |
_c113911 _d113911 |
||