000 00815cam a22002295a 4500
001 L157397
008 121121s2012 xxko f 000 0 eng d
020 _a9781848062917
035 _a(Sirsi) u157397
041 0 _aeng
100 1 _aSuttie, Ed
245 0 4 _aInnovation in timber supply at the London 2012 Olympic and Paralympic Games
260 _aWatford
_bBRE
_c2012
300 _a8p.
_bill.
_c30cm.
490 0 _aBRE Information Paper
_v(17/12)
520 _aLooks at the Olympic Delivery Authority's aim of only using timber from legal and sustainable sources, and discusses the challenges of meeting the target, and the processes that were put in place to deliver it.
521 _aAdvanced
590 _aKA
651 4 _aUnited Kingdom
_y
690 _aBuilding materials and defects
942 _n0
999 _c114756
_d114756