| 000 | 01573cad a2200277 4500 | ||
|---|---|---|---|
| 001 | L158882 | ||
| 008 | 100215n2013 000 0 eng u | ||
| 020 | _a9781783210305 | ||
| 035 | _a(Sirsi) u158882 | ||
| 041 | _aeng | ||
| 100 | 1 | _aKramer, Scott W. | |
| 111 | 2 |
_aConstruction and Building Research Conference _cIIT Delhi, New Delhi _d10-12 September 2013 |
|
| 245 | 0 | 0 |
_aReducing plumbing installation costs through BIM (Building Information Modeling) and field layout solutions _h[electronic resource] |
| 260 |
_aLondon _bRICS _c2013 |
||
| 490 | 0 |
_aCOBRA _v2013 |
|
| 520 | _aA paper presented at the COBRA Conference in New Delhi on 10-12 September 2013. Explores the potential benefits and limitations of using integrated BIM (Building Information Modeling) and field layout technology in plumbing installation. In other words, how much, if any, cost savings can be achieved through the integration of BIM and field layout technologies, and what requirements must be met to maximize these savings? Research confirms that the use of these technologies reduces the plumbing layout costs dramatically. The future advancements in field layout technology were also explored and are expected to continue increasing labour efficiencies in the industry. | ||
| 650 | 2 | 4 | _aCONSTRUCTION AND BUILDING RESEARCH CONFERENCE (COBRA) |
| 650 | 2 | 4 | _aCOST CONTROL |
| 650 | 2 | 4 | _aFIELD LAYOUT TECHNOLOGY |
| 650 | 2 | 4 | _aINSTALLATION COSTS |
| 651 | 4 | _aUnited States | |
| 690 |
_aBIM _96219 |
||
| 690 |
_aCost management _96233 |
||
| 700 | 1 | _aSearle, Mackenzie E. | |
| 942 | _n0 | ||
| 999 |
_c115565 _d115565 |
||