245 0 0 _aGuide to JCT Design and Build Contract 2016
260 _aLondon
_bRIBA
_c2016
520 _aProvides a comprehensive analysis of JCT Design and Build Contract 2016. Explains the differences between the 2011 and 2016 contracts. Covers documents, obligations of the contractor, possession and completion, control of the works, sums properly due, payment, indemnity and insurance, default and termination concluding with dispute resolution.
590 _aKA
650 2 4 _aJCT DESIGN AND BUILD CONTRACT 2016
651 4 _aENGLAND AND WALES
690 _aContracts