000 01334cam a22002775a 4500
001 L159097
002 20627
008 110927s2017 xxk f 001 0 eng d
020 _a9781783212019
035 _a(Sirsi) u159540
041 0 _aeng
050 0 4 _a692.5 $2 18
110 2 _aBuilding Cost Information Service
_91096
245 0 0 _aAlterations and refurbishment price book
_bMaintenance and operating costs
_b2018
250 _a23rd ed.
260 _aPoole
_bBCIS
_c2017
300 _a1
_fv.
_c30 cm.
520 _aFocuses on small to medium sized projects, generally working within an existing building and reflecting the increase in costs brought about the reduction in output, smaller discounts, increased carriage, increased supervision, and less productivity brought about by smaller economies of scale, increased production costs, more difficult access and the possibility of working in occupied premises. New items for 2017 minor repair and replacements to sanitary ware, minor repair and replacements to plumbing installations and an expanded range of floor finishes items and waterproof membranes items.
520 _aSupersedes 22nd ed.
521 _aAdvanced
590 _aKA
651 4 _aUnited Kingdom
_y
690 _aBUILT ENVIRONMENT-BUILDING COSTS
690 _aQuantity surveying
_96263
942 _n0
999 _c115983
_d115983