| 000 | 01133cam a2200229 4500 | ||
|---|---|---|---|
| 001 | WB4003-07 | ||
| 008 | 040121n2004 000 0 eng u | ||
| 035 | _a(Sirsi) u124885 | ||
| 245 | _aGovernment welcomes cleaner coal technology | ||
| 260 | _c2004 | ||
| 490 |
_aDTI Press Release _v(P/2004/032) 21 January 2004 (1) |
||
| 520 | _aGovernment approved a proposal from Rugeley Power Ltd to fit a flue gas desulphurisation (FGD) plant at Rugeley power station in Staffordshire. The new plant will have a dual role. The FGD plant will be designed and operated as a chemical absorption process. Injection of a limestone slurry will remove over 90% of the suphur dioxide from the gases and produce de-sulpho gypsum which is used in the construction industry. http://www.gnn.gov.uk/gnn/national.nsf/Daily+News/ EFC0B057884D474280256E22003A8894?opendocument. | ||
| 590 | _aWB | ||
| 590 | _aWB | ||
| 650 | _aCLEAN COAL TECHNOLOGY | ||
| 650 | _aFLUE GAS DESULPHURISATION | ||
| 650 | _aDE-SULPHO GYPSUM | ||
| 650 | _aCHEMICAL ABSORPTION PROCESS | ||
| 650 | _aCOAL-FIRED POWER STATIONS | ||
| 690 |
_aENERGY _96237 |
||
| 942 | _n0 | ||
| 999 |
_c116959 _d116959 |
||