| 000 | 01127cab a2200289 4500 | ||
|---|---|---|---|
| 001 | X1556 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u17702 | ||
| 041 | _aeng | ||
| 100 | _aWaldron, L. | ||
| 245 | _aPipelines and pumping stations | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aCSM (Chartered Surveyor Monthly) _v3(9) June 1994, 33(1) |
||
| 520 | _aDescribes the £45m South West Water Teign estuary sewerage treatment scheme where quantity surveyors are involved in civil engineering projects. Looks at the construction of the pipelines, pumping stations, pressure pipes, and ductile iron pipework. | ||
| 650 | _aCIVIL ENGINEERING STANDARD METHOD OF MEASUREMENT (SECOND EDITION) | ||
| 650 | _aCIVIEL ENGINEERING STANDARD METHOD OF MEASUREMENT (THIRD EDITION) | ||
| 650 | _aCIVIL ENGINEERING PROJECTS | ||
| 650 | _aICE CONDITIONS OF CONTRACT (SIXTH EDITION) | ||
| 650 | _aSEWERAGE TREATMENT WORKS | ||
| 650 | _aSOUTH WEST WATER | ||
| 650 | _aTEIGN ESTUARY | ||
| 650 | _aTEIGNBRIDGE DC | ||
| 690 | _aBUILDING AND CONSTRUCTION-PROJECTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c11739 _d11739 |
||