245 _aOpening Pandora's box - the Method of Measurement for Highway Works (MMHW): Part 6 - have you got it covered?
260 _c2004
490 _aCivil Engineering Surveyor
_v September 2004, 28-30(3)
520 _aLooks at the way item coverage operates. Stresses it is of vital importance that the preambles to bills of quantities must be reproduced and included in every contract, whether or not amendments to the MMHW are required. Uses case scenarios to illustrate some of the misconceptions which can arise. Compares the issue with other similar forms of contract, such as CESMM. Recommends following some simple rules when using MMHW, such as: ensuring item coverage is amended as required;ensuring it is supported by information and detail in the contract; avoidance of misinterpretations of item coverage;and not to include matters which the contractor cannot price. (See also Abs67769, Abs67770, Abs67964 and Abs68163).
590 _aABS
590 _aABS
650 _aMETHODS OF MEASUREMENT
650 _aCIVIL ENGINEERING
650 _aMMHW
650 _aICE CONDITIONS OF CONTRACT
650 _aHIGHWAY ENGINEERING
650 _aCESMM
650 _aSPECIFICATION FOR HIGHWAY WORKS
650 _aBILLS OF QUANTITIES