| 000 | 01518cam a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS68280 | ||
| 008 | 040915n2004 000 0 eng u | ||
| 035 | _a(Sirsi) u127404 | ||
| 100 | _aMitchell, H. | ||
| 245 | _aOpening Pandora's box - the Method of Measurement for Highway Works (MMHW): Part 6 - have you got it covered? | ||
| 260 | _c2004 | ||
| 490 |
_aCivil Engineering Surveyor _v September 2004, 28-30(3) |
||
| 520 | _aLooks at the way item coverage operates. Stresses it is of vital importance that the preambles to bills of quantities must be reproduced and included in every contract, whether or not amendments to the MMHW are required. Uses case scenarios to illustrate some of the misconceptions which can arise. Compares the issue with other similar forms of contract, such as CESMM. Recommends following some simple rules when using MMHW, such as: ensuring item coverage is amended as required;ensuring it is supported by information and detail in the contract; avoidance of misinterpretations of item coverage;and not to include matters which the contractor cannot price. (See also Abs67769, Abs67770, Abs67964 and Abs68163). | ||
| 590 | _aABS | ||
| 590 | _aABS | ||
| 650 | _aMETHODS OF MEASUREMENT | ||
| 650 | _aCIVIL ENGINEERING | ||
| 650 | _aMMHW | ||
| 650 | _aICE CONDITIONS OF CONTRACT | ||
| 650 | _aHIGHWAY ENGINEERING | ||
| 650 | _aCESMM | ||
| 650 | _aSPECIFICATION FOR HIGHWAY WORKS | ||
| 650 | _aBILLS OF QUANTITIES | ||
| 690 |
_aQUANTITY SURVEYING _96263 |
||
| 942 | _n0 | ||
| 999 |
_c118003 _d118003 |
||