000 02013cam a22003375a 4500
001 121286
008 221228s2021 xxk f 001 0 eng d
020 _a9781783214266
041 0 _aeng
050 0 4 _a692.3095
110 2 _aRoyal Institution of Chartered Surveyors
_94900
240 _aNRM 3
245 0 0 _aNRM 3
_bNew rules of measurement
_border of cost estimating cost planning for building maintenance works
_h[Electronic resource]
260 _aLondon,
_bRICS,
_cOctober 2021
300 _a668p
350 _a45
490 0 _aRICS Guidance Note
520 _aGives guidance on the quantification and description of maintenance works for the purpose of preparing initial order of cost estimates. The rules also aid the procurement and cost control of maintenance works. Effective from 1 December 2021.
520 _aWith NRM 3 we have linked the cost analysis of the capital cost of a construction project with consideration of whole-life-cycle costing, and provided the tools to enable a seamless transfer of cost information from the construction team to the asset management team. In this respect, the use of BIM increasingly plays a significant part in the analysis of cost information, and revisions in this edition acknowledge the move from PAS 1192 to ISO 19650.
520 _aSupersedes 1st edition, 2014 (ISBN )
521 _aAdvanced
650 2 4 _aRICS NEW RULES OF MEASUREMENT
650 2 4 _aNEW RULES OF MEASUREMENT 3
651 4 _aInternational
690 _aCost management
_96233
690 _aConstruction management
_96230
856 _uhttps://www.rics.org/content/dam/ricsglobal/documents/standards/october_2021_nrm_3.pdf
_zAvailable on RICS.org
856 _uhttps://www.rics.org/content/dam/ricsglobal/documents/standards/nrm_3_logic_and_levels_table.xlsx
_zLogic and level tables for NRM3
856 _uhttps://www.rics.org/content/dam/ricsglobal/documents/standards/nrm_3_appendices_e_and_f.xls
_zAppendices E and F in Excel format for NRM3
942 _n0
_2ddc
999 _c121286
_d121286