000 00749cab a2200229 4500
001 ABS39703
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u18433
041 _aeng
100 _aGosney, J.
245 _aGetting there - but still too slowly for Morton
260 _c1988
350 _a0
490 _aContract Journal
_v345(5684) 22 September 1988, 14-17(4)
520 _aReports on the problems being encountered with the channel tunnel infrastructure , in particular railways , and the pressures on funding , timing and private sector involvement.
650 _aBRITISH RAIL
650 _aEUROTUNNEL
650 _aSNCF
690 _aBUILDING AND CONSTRUCTION-PROJECTS
942 _n0
948 _c04/03/1997
999 _c12252
_d12252